Launching May 2026 · Built for UK builders

Estimate in 5 minutes. Win the job.

Turn 10-hour estimates into 5 minutes. Save £5k+ a month and win before competitors reply.

No credit card required. No commitment.

45 of 100 free spots left

Not happy with the estimate? You don't pay.

"I'm not a computer person — I'm a builder. But I had a proper estimate in 5 minutes. Even I could do it."

— Dave T., Builder, Leeds

60× faster* win rate £5k+ saved/mo

*Based on 5-minute estimates vs 5-hour industry average

Why speed matters.

The Client Sends project docs to 5 different companies.
You reply first
You (Using 5 Minute Estimate) Reply in 5 minutes with a professional estimate, materials lists, and a client email.
The Result You win the job before competitors even open the email.
Max – by 5 Minute Estimate
Online · Ready in minutes

Hi Max — Johnson extension. Here are the drawings and my site notes.

📄
johnson_extension.pdf
Floor plans + elevations · 2.4 MB
📝
site_meeting_notes.pdf
Client meeting notes · 340 KB
19:02 ✓✓

Got them, Andrei. A couple of quick questions before I run this:

1️⃣ Underfloor heating — is this throughout the extension or kitchen/bathroom only?

2️⃣ Finishing materials — who supplies tiles, sanitaryware, kitchen units, flooring? Client direct, or through you?

3️⃣ Any provisional sums for specialist items the client hasn't decided on yet?

19:02

UFH throughout. Client supplies tiles and sanitaryware — we supply everything else. No provisional sums yet.

19:03 ✓✓

Perfect. Running the estimate now. I've reviewed the drawings and flagged a few things you'll want to raise with the client:

🚨 Action Required: 3 Drawing Discrepancies

Window on east elevation not shown on floor plan — assumed 1200×1000mm. Client to confirm.

Thames Water build-over agreement — drainage runs within 3m of sewer. Works cannot proceed without it.

Planning permission still pending — not yet approved. Confirm before commencing.

✅ Done. Here's everything — estimate, materials lists, and the client email:

🧱 Building Materials List — Required on Site
Concrete — Wk 114 m³
Facing brick — Wk 23,200 units
Cavity block — Wk 21,800 units
Bi-fold RSJ — Wk 31 unit
Roof timber — Wk 442 lengths
UFH pipe + manifold — Wk 5180m
🎨 Client Finishing Materials — Client to Supply
Floor tiles — needed Wk 738 m²
Wall tiles — needed Wk 722 m²
Sanitaryware — needed Wk 81 set
Kitchen units — needed Wk 9Client direct
To: sarah.johnson@email.com
📋 Estimate: Johnson Extension — Andrei Constructions Ltd

Dear Sarah, please find your estimate and project details below.

Groundworks & Foundations£18,400
Structural Steel & Masonry£34,200
Roofing & Insulation£22,600
M&E First Fix (UFH, Plumbing, Electrics)£28,500
Carpentry & Finishing£31,300
TOTAL (excl. VAT) £135,000
📋 Items to Confirm

East elevation window not on floor plan — please confirm size.

Thames Water build-over agreement required before groundworks.

Planning permission still pending — we cannot commence works.

📦 Client to Supply (see attached schedule for dates)

Tiles (38m² floor + 22m² wall), sanitaryware, kitchen units. Delivery dates in attached programme.

A full project programme is attached. Estimate valid 30 days. — Andrei Constructions Ltd

Estimate + schedule + lists + email ⚡ 5 min

Sound Familiar?

Andrei's Tuesday night.

Before 5 Minute Estimate

🌙
9:30 PM

Still at the desk

Family's watching TV. Mates are at the bar. Andrei is measuring drawings by hand. Again.

😤
11:00 PM

Missed drawing errors

No build-over agreement. Planning still pending. He only finds out when work has started.

📱
Next day

"Used someone else"

The client needed the quote faster. Another builder quoted same day. Job gone.

📋
Weeks later

Wrong materials, wrong time

Nobody told the client when to order tiles. Delivery late. Programme blown. Margin gone.

⚡ Then Andrei found 5 Minute Estimate
📤
At the meeting

Uploads from his phone

Drawings and meeting notes uploaded before he's left site. Still shaking the client's hand.

⚠️
3 minutes later

Max spots the risks

Build-over agreement flagged. Planning status flagged. Client sees Andrei is sharp.

📧
5 minutes total

Client gets everything

Branded estimate, schedule, materials lists with dates — sent in one crisp email.

🍺
That evening

Signed. Pub time.

Impressed by the speed, client signs today. Andrei's at the bar with friends.

No credit card required

Your time vs. Max's

What changes when you stop estimating by hand.

1255075100

10 estimates / month

Recommended Workflow

The Old Way

100h

£5,000

5 Minute Estimate

50m

£500

You save 99 hours and £4,500 every month.

That's over 12 full work days reclaimed.

No credit card required

Why it works

What actually changes.

60×

Stop Working Evenings on Quotes

What takes 10 hours by hand takes Max under 5 minutes — and it catches drawing errors, missing approvals, and compliance gaps you'd have missed.

"I get my evenings back." — Marek K.

Win 3 Jobs for Every 1 You Used To

Quote same-day with a branded estimate, flagged risks, and a project schedule. Clients choose professionalism and speed — every time.

"Clients sign the same day." — Andrei D.

£5k+

Save Enough for a New Van Every Year

More tenders × higher win rate × more time on site instead of behind a desk. The hours and money you get back add up fast.

"Cut 2 hours off every estimate." — Stefan P.

Catch

Never Eat Costs From a Missed Item Again

Max reviews every drawing for discrepancies, missing approvals, build-over agreements, planning status, and structural gaps before you quote.

"Flagged a planning issue I nearly missed." — Andrei D.

Builders already using it

What builders are saying.

"This changes everything."
Every Sunday doing estimates while my family's in the next room. If Max does what it says, this changes everything. Signed up day one.
Marek K.
Marek K.
Builder · 9-person team · Manchester
"Finished on schedule — first time."
The materials list with delivery dates alone is worth it. My client knew exactly when to order tiles. Cut 2 hours off every estimate. First time we finished on schedule without chasing.
Stefan P.
Stefan P.
General Builder · 14 staff · Birmingham
"Saved me from a serious problem."
It flagged that planning hadn't been approved on a job I nearly started. Saved me from a serious problem. I look like an expert now. Clients trust me more.
Andrei D.
Andrei D.
Renovation Specialist · 7 staff · London
"Even I could do it."
I'm not a computer person — I'm a builder. But I uploaded my drawings, answered a few questions, and had a proper estimate in 5 minutes. Even I could do it.
Dave T.
Dave T.
Builder · 4-person team · Leeds

No credit card required

What this costs you otherwise

  • Hire a QS: £500–£1,000 per estimate
  • Do it yourself: 10 hours × £50/hr = £500 of your time
  • 5 Minute Estimate: £50 per estimate — 10× cheaper. Same result in 5 minutes.

No subscription. No monthly fee.

Not good enough to send? You don't pay.

Upload your drawings, get a professional estimate back. If it's not worth sending to your client, you don't pay for it. Full stop.

Common questions.

How accurate are the estimates?

Very accurate. Max, your estimating assistant, reads your drawings, asks clarifying questions, and cross-checks for errors. You review everything before it goes to the client.

What happens after my 2 free estimates?

Each estimate costs £50 — a £50 estimate vs £500+ doing it yourself. No subscription, no monthly fee. Only pay when you use it.

Do I need to install anything?

No. You chat with Max through WhatsApp or the web. Works on your phone, on site.

Is my data safe?

Yes. Your drawings and estimates are encrypted and stored securely. We comply with GDPR.

Can I edit the estimates?

Absolutely. Everything comes as an editable Excel file. Change any line yourself, or ask Max to make changes for you within seconds.

When will this be fully live?

We're building Max right now and expect to go live in May 2026. Reserve your free estimates now — you'll be first in line when we launch.

Try it free — first 2 estimates on us

No credit card required. No commitment.

45 of 100 free spots left

Not happy with the estimate? You don't pay.

Trusted by UK builders saving 40+ hours a month

Free spots left 45 of 100