← Project types

Bathroom

Bathroom refurbishment estimate.

Bathroom refurbishments are among the most common home improvement projects—and among the hardest to price accurately. This guide covers everything from strip-out to final silicone.

Authored by Alexandr Vreme & Maksym Vasylkov
Published — Next review

Who this guide is for

This guide is for tradespeople and estimators preparing bathroom refurbishment quotes. It applies to full strip-out and refit projects in houses and flats, covering both small en-suites and larger family bathrooms.

Information needed

Before pricing a bathroom, confirm with the client or spec:

  • Existing layout and whether walls, the toilet or bath are being moved
  • New layout drawings or a clear plan of where everything goes
  • Sanitaryware specification (manufacturer, model, finish)
  • Tiling extent — full-height, half-height, or feature wall only
  • Floor finish (tile, LVT, stone, heated floor system)
  • Extractor fan location and ducting route
  • Window or roof-light replacement requirements

Typical work breakdown

  • Strip and disposal — removing old suite, tiles, floor covering, and taking away waste
  • Plumbing alterations — hot and cold pipework, waste runs, shower valve plumbing
  • Electrics — shower supply, extractor fan, lighting scheme (including zones)
  • Tanking wet areas — waterproofing shower enclosure and bath area
  • Tiling walls and floor — substrate prep, tile fixing, grouting
  • Sanitaryware fitting — bath, WC, basin, shower tray, taps and fittings
  • Mirror, cabinet and accessories fitting
  • Decoration — ceiling paint, pipe boxing paint, finishing touches
  • Floor finish — laying and finishing the final floor covering

Commonly missed costs

  • Upgrading existing waste pipes to modern 40 mm or 50 mm sizes
  • Concealed cistern frame installation and access panel
  • Making good on the opposite side of walls where pipework runs
  • Waterproofing (tanking) behind tiles — required in shower zones
  • Shower tray installation — level-access trays need careful subfloor prep
  • Bath panel fitting, particularly with access hatches for maintenance
  • Silicone and sealant — all sanitary seals, corner joints, bath-to-tile joints

Miniature worked example

A 5 m² en-suite bathroom with full-height tiling, new suite and electric shower:

  • Strip and disposal — £400
  • Plumbing alterations — £1,000
  • Electrics — £600
  • Tanking wet areas — £300
  • Tiling walls and floor — £1,500
  • Sanitaryware fitting — £800
  • Total labour and sundries: £4,600 (excluding sanitaryware suite and tiles)

Questions to ask

  • Is the client supplying the sanitaryware, or am I procuring it?
  • Are there existing concealed services that may need upgrading?
  • Does the floor structure need strengthening for a stone or heavy tile floor?
  • Is the extractor fan ducting already in place, or does a new route need cutting?
  • Who is responsible for making good ceilings or walls after any structural alterations?

Related guides

See our guide to Kitchen Refurbishment Estimates for larger wet-trade projects, and Tiling Estimates for detailed tile pricing.