Detailed construction estimate.

A detailed construction estimate is built from measured quantities taken from drawings, priced using current labour, material, and plant rates, and reviewed before submission.

This topic is covered in full on our main Estimating Process guide, which walks through every stage from enquiry through measurement, pricing, and review.

Key elements of a detailed estimate

  • Full quantity take-off from construction drawings
  • Priced using current supplier and subcontractor quotations
  • Labour built up from gang rates and productivity assumptions
  • Preliminaries, overheads, and profit added separately
  • Assumptions and exclusions clearly stated

Miniature example

For a small extension, a detailed estimate would list every element individually: 28 m² of brickwork, 12 m of drainage, 3 windows, 1 door, 44 m² of roof covering — each with its own unit rate rather than a blanket per-square-metre figure.